If you are looking for an accurate asset inventory within your OT/ICS environments, our OT/ICS Asset Inventory service is a perfect solution.
Solutions Tailored to Your Needs
Just like all our services, OT/ICS Asset Inventory service is tailored to your business. So, it may cover all areas or specific sections of your existing control system including:
Is OT/ICS Asset Inventory necessary?
OT/ICS Asset Inventory provides robust asset information of your systems on site which is a critical foundation of your network security. It also greatly helps direct future development and support work, which in turn allows you to drive improvements in the right areas.
Objectives OT/ICS Asset Inventory:
What to expect in the inventory report?
- Programmable Logic Controllers / Human Machine Interface
- List of all hardware systems in your site, including make/model as well as key statistics such as memory, storage, etc
- Space List
- Correct operation & function
- PLC code analysis
- PLC code backup
- General observation of correct wiring & installation
- HMI correct setup.
- HMI application backup.
- Recommendations
- Supervisor Control & Data Acquisition
- Screen design & application function
- Scripts & Reporting
- Data archiving & storage
- Licence inventory
- PC hardware & analysis; hard disc space, memory allocation etc.
- Deployment of correct service packs
- Networking & PLC communicating interface
- System Architecture
- Recommendations
- Control & Engineering Networks
- PLC addressing & correct function.
- IP configuration & setup.
- Communications & PLC / SCADA interface analysis.
Process:
Step 1: Opensoft Systems conduct an online site scoping.
Step 2: We provide you with a project proposal.
Step 3: If the project proposal is accepted we arrange for our systems applications engineers to be onsite for one to two days to carry out the work.
Step 4: Further work is carried out off-site, including preparation of the report.
Step 5: You receive a comprehensive written inventory with recommendations, as well as PLC code and HMI backup.
Step 6: (Optional) A follow-up technical meeting to run through your report, discuss our findings, recommendations and provide clarity to any technical points required and future work recommended.
Pricing:
Our pricing process considers the number and type of PLC, HMI, SCADA systems and networks on your site. As each OT/ICS Asset Inventory is adapted to suit your requirements, pricing is provided after an initial site scoping exercise done virtually. Information gathered is then validated by our head engineer before we prepare the cost proposal. This process ensures that we cover all your requirements and there’s no unexpected charges are needed along the way.
Our Customers
No short code found