Titan Steel Wheels

Production Engineering Manager, ,

“We approached Opensoft Systems to take a look at the control system within Titan Steel Wheels Paint Facility. They re-developed application using SCADA software and integrated it into the existing PLC 5 hardware. They upgraded the SCADA system to the latest version and deployed it on a modern PC running a Windows 10 Operating System.

In updating the top-end SCADA system and leaving the original PLC in place Opensoft Systems delivered and deployed a solution that was not only cost-effective but practical too. We are very happy with the recent project.”